Our Projects
Our story is built on passion, dedication, and a commitment to delivering meaningful experiences. Every step of our journey reflects our values and the vision that continues to drive us forward.
Department of Energy Customer
Core Platform Enhancement and Workflow Maturity
A primary focus has been the modification and enhancement of critical applications within Archer. This included updating the Policies application to incorporate advanced approval paths requiring sign-offs from key stakeholders (SCA/ISSO/ISSM). Furthermore, the team successfully modified the Allocated Controls module to improve visibility by displaying critical controls in bold font and adding a dedicated column for this status. Workflow maturity was also achieved through developing new applications—such as those supporting BARA and TMRAs—and building functionality to manage additional attachments, ensuring that non-policy documents could be properly tracked within authorization packages.
Advanced Data Integration and Feeds
The team has undertaken extensive work connecting Archer to various enterprise systems to achieve a centralized view of the nuclear security posture. Notable accomplishments include establishing data feeds from ServiceNow CMDB, Tenable, and other continuous monitoring APIs (SNOW, Steel cloud, etc.). These integrations were technically complex, requiring significant effort to manage data formatting, overcome service account limitations (such as restricted internet access for automated NVD feed downloads), and standardize disparate hardware naming conventions. This work has successfully transitioned the platform from a manual tracking tool to one that incorporates real-time security intelligence.
Infrastructure Modernization and Data Migration
Looking ahead, the project team's priority is centered on modernizing the underlying infrastructure by planning the migration of the entire Archer instance to AWS (Amazon Web Services). This high-priority effort involves developing comprehensive architecture sizing requirements, designing the cloud environment, and creating detailed data migration plans for both current and future instances. Concurrently, significant efforts have been dedicated to validating and preparing historical data from the legacy 6.8 instance for transfer into the upgraded 6.11 environment.
Reporting, Documentation, and Future Scope
Finally, substantial effort has been placed on improving visibility and compliance reporting. This includes developing requirements and initial functionality for specialized dashboards and metrics tailored specifically for CISO, ISSM, and ISSO leadership. The team also worked to implement a "Historical Documentation" application to manage outdated records systematically and developed comprehensive training materials. By addressing these technical limitations and expanding the platform's functional scope, the project is well-positioned not only for its planned AWS migration but also for supporting future organizational growth and compliance needs across multiple site instances.
Department of Defense Customer
Initial Planning and Environment Readiness
The initial phase focused heavily on detailed planning, requirements gathering, and establishing the architectural blueprint for the eGRC program. Our team successfully collaborated with agency personnel to solidify prerequisites, conduct architecture briefings, and establish necessary project documentation. This required navigating complex logistical dependencies, including coordination of site surveys and securing formal approvals for the Virtual Machine (VM) architecture design. Through persistent follow-up, we managed the foundational steps necessary—from pre-install checklist delivery to defining the scope for Continuous Monitoring and POAM packages—ensuring that all subsequent installation efforts were built upon a solid strategic foundation.
Overcoming Technical Implementation Challenges
The technical build of the Archer environment presented several significant challenges that required dedicated effort and problem-solving from our team. We systematically identified and addressed critical gaps in the underlying infrastructure, including issues related to domain service accounts, web certificates, SQL server access (including firewall blocking), and missing management tools like SQL Management Studio. Our rigorous on-site presence was instrumental in diagnosing these complex prerequisites, ensuring that when the environment finally reached a state of readiness, we were prepared to execute the full installation lifecycle.
Successful Installation and Configuration Milestone
The most significant milestone was the successful deployment of Archer into the test environment in late November/early December 2017. Our team executed the complete core installation, followed by comprehensive post-installation configuration. We successfully configured IIS and installed crucial modules such as Continuous Monitoring (CM) and POAM packages. Furthermore, we moved beyond mere installation to provide foundational training on best practices, including basic administrator guidance and initial setup of specialized applications, such as building the eMASS data application framework.
System Expansion and Final Readiness
In the final reporting period, our accomplishments focused on hardening and expanding the operational scope of the system. We proactively managed environmental remediation following necessary IP and database changes, which required a re-installation effort to maintain integrity. Critically, we successfully installed and configured key components including dedicated Controls applications, the eMass application module, and integrated prototype datafeeds. Furthermore, the successful loading of major datasets, such as the 800-53 Rev 4 Controls dataset, confirms that the system is not only technically operational but also populated with the necessary compliance material to support full testing cycles.
In summary, the team has successfully transitioned the project from a conceptual phase through multiple technical hurdles and into a fully functional, tested state within the designated test environment. We have delivered an Archer solution that is configured, integrated, and ready for the customer's internal training cycle, positioning us perfectly to proceed with the final installation into the production environment upon confirmation of the necessary testing milestones.
Department of Energy Customer
Advanced Vulnerability and Threat Management
Our primary focus has been to modernize and automate the handling of technical scan data. We successfully designed and implemented a sophisticated, self-managing system for vulnerability ingestion using Nessus and external CVE libraries. This involved creating a dedicated Nessus Plugin Library application that serves as the single source of truth for plugin information, eliminating the need for repeated manual entry into every Vulnerability Scan Result record. Furthermore, we developed several critical data feeds—including "Nessus Plugin Import" and cross-reference feeds to link CVEs to specific scan results (VSR)—which automatically ingest up to 140,000 records and correlate vulnerabilities with industry standards like CVEs. We also enhanced our capabilities by modifying the Vulnerability Scan Results process to handle both raw and modified .nessus files, greatly increasing the breadth of data we can analyze and ensuring that findings are accurately linked to associated controls.
Enhanced Compliance Scanning and Control Mapping
To ensure comprehensive compliance coverage, we have focused on integrating diverse scanning mechanisms into a unified reporting structure. We developed specialized XSL transforms for complex standards like SCAP and Nessus configuration results, allowing us to capture detailed security posture information previously difficult to integrate. For STIG compliance, we successfully built the DISA STIG import process, importing thousands of rules into the system database. Beyond simply ingesting data, we redesigned core applications (such as Devices and Allocated Controls) by implementing complex calculated fields and cross-references that automatically determine key metrics, such as "Date First Found," "Last Compliance Scan Date," and whether multiple failures exist for a given rule set. These improvements ensure that reporting is always based on the most current status of a device or control record within Archer.
Workflow Automation and Risk Governance Maturity
A major accomplishment has been the overhaul and refinement of our core risk management workflows, particularly for Program of Action & Milestones (POA&M) and Risk Acceptance (RBD). We rebuilt these processes into a highly functional “Versatile Advanced Workflow” model, providing significant improvements in user experience and data integrity. The team successfully incorporated support for Critical Security Controls (CSCRs) across both POA&M and RBD workflows, ensuring that the process can handle complex risk types. Functionally, we implemented granular rule sets requiring mandatory fields at specific review stages (e.g., ensuring reviewer names are populated before submission), which vastly improves auditability and enforces adherence to governance procedures.
Operational Efficiency and Project Foundation
Finally, our efforts have focused heavily on architectural improvements that underpin the entire solution. We addressed critical operational issues by enhancing permissions management across multiple roles and applications, fixing propagation issues for read-only flags, and modifying calculation logic across core objects like Allocated Controls and Devices. By creating new data feeds to import external compliance data (e.g., CISA data), we are ensuring that our records are not just based on internal scans but reflect the latest industry threat intelligence. These consistent improvements have resulted in a stable, scalable platform ready for large-scale testing and advanced user adoption across the client organization.
Health and Human Services Customer
Over the reporting period from March 2021 through October 2021, our team achieved substantial progress across all major phases of the Archer GRC implementation. We successfully navigated a complex technical landscape, resolving deep architectural challenges and completing multiple mission-critical integrations that have positioned the system for successful deployment.
Security Architecture & Identity Management
In the foundational phase, we established robust security protocols by tackling core identity access issues. Our team designed the necessary Single Sign-On (SSO) framework, strategically determining that reliance on Windows Authentication was the optimal architectural path to inherit trust from standard network logins. Furthermore, we successfully planned and began implementing critical multi-factor authentication (MFA) capabilities using OpenID standards, ensuring a highly secure perimeter for user access right out of the gate.
Advanced Integrations & Threat Intelligence
Our most advanced work involved connecting Archer to the wider security ecosystem. We developed sophisticated data feed pipelines to centralize threat intelligence and vulnerability data. A major highlight was the successful integration of leading scanners like Tenable and Nessus, allowing us to pull real-time vulnerability metrics, plugin data, and host information into Archer. Furthermore, we developed a complex data feed that pulls historical and modified CVE records directly from the NIST National Vulnerability Database (NVD), drastically enhancing our organization's ability to manage risk contextually.
Platform Stabilization & Core Functionality Mastery
Throughout the weeks, we tackled numerous deep-dive technical challenges that ensured the stability of the core platform. We resolved critical issues within the global search functionality—a feature vital for user experience—and configured complex workflows, including A&A module processes and advanced record progress tracking. Our troubleshooting skills were instrumental in resolving persistent production data feed failures, often requiring us to pinpoint underlying infrastructural problems like incorrect firewall rules or database permissions.
Deployment Readiness & Operational Milestones
As the project matured, our focus shifted to readiness for go-live. We successfully managed the logistics of critical infrastructure setup, including configuring and testing new services servers in the DMZ environment using newly acquired hardware. Crucially, we completed all necessary administrative milestones—including finalizing ALT card paperwork—and delivered mandatory security, privacy, and records management training to key stakeholders. These collective efforts confirm that the platform is not only technically functional but operationally ready for organizational adoption.
In summary, our collaborative effort ensured every major architectural layer was built, tested, and stabilized, transforming a concept into a fully capable, integrated GRC system.

Department of Energy Customer
The team has made significant progress in aligning the system's functionality with the customer's specific operational requirements and compliance standards. A primary focus has been the successful update of the Controls workflow to ensure full adherence to the customer's Assessment and Authorization process. This alignment is further bolstered by the optimization of the Exception Request Workflow and the refinement of the PTA and Boundary check processes, which now allow for a more streamlined transition to Allocated Controls. Additionally, we have successfully completed the ingestion of existing SAR and SSP information, ensuring that historical data is integrated into the current framework.
To enhance data visibility and situational awareness, the team has delivered a suite of specialized dashboards tailored for key stakeholders, including the ISSO, ISSM, AO, and CONMON. These tools, combined with the ability to select controls for continuous monitoring, provide users with the high-level oversight necessary for effective governance. Furthermore, we have improved the integrity of vulnerability management by successfully recycling Security Center Definitions and Security Center Scan Results, ensuring that the data presented in reports is current and accurate.
User experience and communication have also been central to our recent achievements. We have implemented a notification system to ensure that all relevant customer groups are promptly alerted to any changes in policies or procedures. Additionally, the team has addressed critical system stability issues, such as resolving technical errors encountered when saving hardware additions to subcomponents. Through these efforts, and through regular progress demonstrations, we have ensured that the system remains highly functional and closely aligned with the needs of the customer.

Department of Defense Customer
Throughout the engagement, the team successfully guided the customer through the complex process of transitioning from the architectural planning phase to a fully operational Archer test environment. Initial efforts focused on establishing a technical foundation by providing comprehensive pre-installation checklists, architectural briefings, and essential documentation. These proactive steps ensured that the customer's engineering teams had the necessary guidance to navigate the security paperwork and hardware installation processes required for a compliant environment.
Once the infrastructure was established, the team demonstrated significant technical problem-solving to overcome several deployment hurdles. Despite early challenges involving domain service accounts, web certificates, and SQL configuration/firewall settings, the team successfully navigated these complexities to complete the Archer installation within the test environment. This included the configuration of IIS, the completion of post-installation checklists, and the strategic deployment of Continuous Monitoring and POAM packages—including resolving version compatibility issues to ensure a successful installation.
Beyond the core installation, the team focused heavily on empowering the customer and enhancing the utility of the platform. We provided hands-on administrator training to customer personnel and transitioned into advanced application development. Key accomplishments in this phase included building applications for eMASS data, demonstrating field and application management, and integrating vital datasets such as the 800-53 Rev 4 Controls.
Finally, the team ensured the continued stability and evolution of the environment. We successfully remediated the environment following IP and database changes, including re-installing Archer to maintain operational integrity. To facilitate the customer's transition to production, we also installed new Controls, eMass applications, and prototype datafeeds, ensuring the system is robust and ready for full-scale implementation.

Department of Treasury Customer
Project Foundation and Technical Implementation
Our initial efforts focused heavily on establishing a robust technical foundation for the eGRC platform at the agency. This phase involved successfully guiding the client through environment setup, including addressing complex prerequisites such as permissions structuring and FIPS hardening requirements. We worked closely with the internal IT teams to ensure that the core Archer 6.3 documentation was implemented correctly. A significant accomplishment during this period was the successful installation of key Public Sector packages, which laid the groundwork for integrating governance, risk, and compliance functions into a unified system.
Core Module Configuration and Issue Resolution
As the project advanced, our focus shifted to configuring critical modules within the Archer platform. We successfully tackled several complex technical hurdles related to data integrity and application dependencies. This included detailed work on importing Controls data into the A&A (Assessments & Assessments) application, resolving field misalignment issues in key areas like Control Catalogs and Assessment Objectives. When encountering licensing or versioning conflicts—such as difficulties with the POA&M package installation—we provided expert recommendations, advising the client when to use specific versions (e.g., 6.1 vs. 6.3) or recommending the setup of new instances to ensure maximum stability and functional alignment across all interconnected modules.
System Stabilization and Knowledge Transfer
In the later stages, we achieved significant progress in stabilizing the environment and ensuring operational readiness. We worked through detailed bug remediation and optimized the A&A package structure, particularly by advising on how certain data dependencies (such as Offices or Departments) could be made non-mandatory without compromising security. Our final accomplishments centered on knowledge transfer; rather than continuing active configuration, we successfully transitioned support to the client team. This shift allowed agency staff to begin actively learning and navigating the A&A package, demonstrating that the system is stable and functional, marking a successful transition from deep technical consultancy to user proficiency.

Financial Services Customer
Project Architecture and Core System Design
The initial focus of the project centered on building a robust foundation for the Enterprise Governance, Risk, and Compliance (eGRC) system. We successfully finalized the foundational design of the Risk System, establishing critical components such as implementing manual risk overrides and removing outdated risk exposure calculations. A major technical milestone involved establishing the Development/UAT environment copy, ensuring that the system could be tested in a stable, segregated setting before production deployment. Furthermore, significant effort was dedicated to integrating external data sources; we successfully implemented the connection with LexisNexis data feeds, which confirmed its ability to ingest large volumes of primary documentation and topics into Archer. This ensured that the system's knowledge base is comprehensive and continuously updated by authoritative third-party intelligence.
Operational Controls and Process Enhancements
Substantial work was completed in refining core governance processes and controls within Archer. We introduced several granular improvements to enhance data integrity and workflow efficiency. Key accomplishments included splitting the "Open" status into distinct categories ("Open – Never Tested" and "Open in Testing") to provide clearer visibility during control testing cycles, along with adding complex calculations to automatically determine which status category is appropriate. The system was also enhanced by creating specialized linkages that allow users to cross-reference regulatory obligations directly to Authoritative Sources and Regulators. To strengthen internal controls, we developed mechanisms within the Control Procedures module that reference test results from various assessment questionnaires (Operating, Design, and Implementation), providing a verifiable audit trail for every control assessed.
Data Integrity and System Refinements
Throughout the reporting period, our team systematically addressed data quality and system usability across multiple modules. We corrected and updated key fields—such as adjusting the calculation logic for "Sample Size" in Control Procedures to account for multiple related risks—and implemented new scope management capabilities by creating dedicated Scope fields within both Authoritative Sources and Regulatory Intelligence Items. On the technical front, we resolved initial challenges regarding date field calculations by addressing how Archer handles time internally (UTC). We also refined system workflows, such as adjusting control procedure status tracking and implementing advanced permissions to manage sensitive records. Finally, we successfully added specialized filtering rules—such as preventing "empty" obligations from populating Control Standards—to maintain the accuracy and relevance of compliance data within the eGRC platform.